Petition · Electronic signing takes place on Ísland.is
Sign on Ísland.is ↗
Concept image: 30 wind turbines, 200 m tall, on vegetated heathland in Melrakkaslétta. Hallgrímskirkja church, 74 m, is inserted for comparison.

Concept image illustrating the proposed development. A more accurate view at the correct distance is in the 360° section. This is not a verified visualisation of Hnotasteinn; the location, number of turbines and visual proportions have not been verified. Background photo: Spike, Wikimedia Commons, CC BY-SA 4.0.

Melrakkaslétta · Nature · Future

A landscape that deserves the benefit of the doubt.

Untouched wilderness is precious and rare in Europe.

A wind farm on Hólaheiði at Hnotasteinn would have a major visual impact on a large, largely untouched area and could affect its rich birdlife. The impact would be permanent and irreversible. We call on Norðurþing municipal council to abandon plans for an industrial zone on Hólaheiði.

Status · 13.10.2026

After a re-assessment, the Master Plan project board again proposes that Hnotasteinn be placed in the on-hold category – not the energy-use category. Public comments can be submitted in the government consultation portal until 4 January 2027. Norðurþing municipal council has not taken a formal position. The decision is still open – the petition runs until 16 December 2026.

View timeline ↓
01 / Listen

Silence is part of the land.

Two recordings by Magnús Bergsson. One was made on Hólaheiði in Melrakkaslétta, the other next to wind turbines.

This is how Melrakkaslétta sounds

This is how wind turbines sound

Sound recordings: Magnús Bergsson, Hljóðmynd – fieldrecording.net. Four-minute excerpts from longer recordings, made at different locations with different equipment; volume is as recorded. Photo: Magnús Bergsson.

02 / See for yourself

Look around in 360°.

360° photo taken in Melrakkaslétta on 3 October 2026. The 30 turbines are inserted at the correct size and distance, 12–17 km from the camera. The “3 km” and “500 m” buttons show examples of how they would look closer up, for instance from a farm, a road or a hiking area.

Drag to look around, zoom with the mouse wheel or two fingers. The “Fela vindmyllur” (hide turbines) button shows the landscape as it is today. The controls inside the 360° viewer are in Icelandic. 360° photo and processing: Sigursteinn Baldursson, Kúlumyndir 32.

Open full screen ↗
03 / New assessment · October 2026

The greatest impact on nature of seven sites.

On 13 October 2026 the project board of Iceland’s Master Plan for Nature Protection and Energy Utilisation published a new assessment of seven wind power proposals. Hnotasteinn scores worst for nature, yet it is not proposed for the protection category but for the on-hold category 33.

16.8 / 20
Impact on unspoiled wilderness

By far the highest of the seven sites. Next comes Sólheimar with 12. The project board describes the impact as very negative.

6.3
Overall impact on natural and cultural heritage

The highest score of all seven sites from expert group 1.

5.6
Impact on hydrology

Highest of the seven – the other sites range from 0.4 to 2.8. Bedrock also gets the highest score: 6.4.

Overall impact on natural and cultural heritageExpert group 1 score and the project board’s proposal. Higher number = greater impact.
  • Protection
  • On hold
  • Energy use
  1. Hnotasteinn6.3On holdHnotasteinn · 150–216 MW
    Overall impact 6.3 · wilderness 16.8 of 20
    Proposal: On hold
  2. Sólheimar5.4ProtectionSólheimar · 75 MW
    Overall impact 5.4 · wilderness 12.0 of 20
    Proposal: Protection
  3. Alviðra4.8On holdAlviðra · 98 MW
    Overall impact 4.8 · wilderness 3.4 of 20
    Proposal: On hold
  4. Hrútmúli4.4ProtectionHrútmúli · 101 MW
    Overall impact 4.4 · wilderness 3.4 of 20
    Proposal: Protection
  5. Garpsdalur3.7Energy useGarpsdalur · 75 MW
    Overall impact 3.7 · wilderness 7.2 of 20
    Proposal: Energy use
  6. Mosfellsheiði I3.7ProtectionMosfellsheiði I · 100 MW
    Overall impact 3.7 · wilderness 0.2 of 20
    Proposal: Protection
  7. Mosfellsheiði II3.7ProtectionMosfellsheiði II · 100 MW
    Overall impact 3.7 · wilderness 0.2 of 20
    Proposal: Protection

Four sites with less impact on nature go into the protection category. Hnotasteinn, with the greatest impact, is put on hold. The classification does rest on more factors – Mosfellsheiði, for example, scored highest for impact on outdoor recreation (10 of 10) – but nowhere does Hnotasteinn come out well for nature 33.

Qair says

Hnotasteinn is not in a core wilderness area according to wilderness mapping, although some turbines may be visible from it. There would be up to 30 turbines, up to 200 m tall and up to 7.2 MW each.

Friðjón Þórðarson, CEO of Qair Ísland · Vísir, 12 May 2026 34
The Master Plan says

“Very negative impact on unspoiled wilderness.” Wilderness scores 16.8 of 20 – more than any other site. And 30 turbines × 7.2 MW = 216 MW, the same figure as the larger version in the Master Plan assessment.

Report of the 6th-phase project board · October 2026 33
Something else you can do

Submit a comment by 4 January 2027

The petition goes to Norðurþing municipality. A comment in the government consultation portal (Samráðsgátt) goes straight to the Master Plan project board, which submits its final proposal to the minister in February 2027. Every comment is read and published.

  1. Open case 4349 in Samráðsgátt.
  2. Log in with Icelandic electronic ID (rafræn skilríki).
  3. Copy the draft here, add your own words and submit.

A comment in your own words carries more weight than identical text from many people. Use the draft as a starting point. Submitting requires an Ísland.is login.

04 / The project

What is planned?

Hnotasteinn is Qair Iceland’s wind power project on Hólaheiði, about 6.5 km east of Kópasker. Below are the key figures according to the developer.

Qair’s plans30turbines at most 01
Qair’s plans216MWapprox. installed capacity 01
Assessment basis200mmaximum tip height – almost three times Hallgrímskirkja church 02

Installed capacity is not continuous output, and the final turbine model has not been chosen. The 2021 scoping document assumed 34 turbines and 200 MW 06, and the Master Plan assesses the option at about 220 MW 05.

More than the turbines themselves

Each turbine comes with a concrete foundation up to 30 m in diameter, a crane pad and a road. Qair roughly estimates 21,000 m³ of concrete and 1,800 tonnes of steel for the foundations of 30 turbines 02. According to the scoping document, about 17 km of new roads would be needed within the area, plus about 250,000 m³ of fill material 06.

Community and jobs

More than one side to the story

Qair believes the project could create jobs, increase electricity supply and support infrastructure 01. Few permanent jobs are expected during operation 06. The Master Plan project board noted that the cost of connecting to the transmission grid is very high, ISK 10–14 billion 05.

The Hnotasteinn study area (yellow-green) within an Important Bird Area. Map based on a map by EFLA 06.

Where is Hnotasteinn?

On Hólaheiði in Núpasveit, in the middle of Melrakkaslétta. The heath is flat – vegetated moorland, post-glacial lava and small lakes. The study area covers 3,330 ha.

Sheep-gatherers’ hut
850 m
Nearest farm
2.9 km
Kópasker
6.5 km
Vatnajökull National Park
22 km
Dettifoss
45 km
Visibility assessed up to
45 km
  • Study area: 3,330 ha
  • Wind farm area: about one fifth
  • Permanent disturbance: 54 ha

Explore the area on Google Maps

Open in Google Maps ↗

Satellite image from Google. You can pan and zoom the map to explore the heath.

Detailed technical description from the 2021 scoping document
ComponentSizeAreaDuration
Turbine foundationsUp to 30 m in diameter2.4 haPermanent
Turbine footings1,610 m² each5.5 haPermanent
New roads and underground cables17,000 × 4.5 m45.9 haPermanent
Collector station, substation and offices3,000 m²0.3 haPermanent
Turbine work pads2,240 m² each7.6 ha1 month
Material storage1,640 m²5.6 ha10 months

Reference model: Vestas V162‑5.6 MW, hub height 119 m and 162 m rotor diameter. Construction about 12 months, probably spread over two years, with up to 100 workers. Operating life at least 25 years. Connection to Landsnet’s substation at Snartarstaðir via 33 kV underground cables 06.

05 / Nature and birdlife

Not empty land.
A living landscape.

Habitats that matter.

The heaths, lakes and wetlands of Melrakkaslétta are part of an internationally Important Bird Area. Red-throated diver, great northern diver and gyrfalcon are among the species recorded in data from the Icelandic Institute of Natural History 03.

Red-throated diver on water
Photo: Dick Daniels · CC BY-SA 3.0
Gavia stellata

Red-throated diver

110breeding pairsData from 2016 · Melrakkaslétta
Great northern diver on water
Photo: Dick Daniels · CC BY-SA 3.0
Gavia immer

Great northern diver

16known territoriesData from 2016 · Melrakkaslétta
Gyrfalcon on a rock
Photo: Ólafur Larsen · CC BY-SA 2.0
Falco rusticolus

Gyrfalcon

14known territoriesData from 2016 · Melrakkaslétta

About the data. The figures apply to the wider Melrakkaslétta area, not only Hnotasteinn. They are historical data from 2016, not a new count or a forecast of bird deaths.

About the photos. The photos show the species and were not taken in Melrakkaslétta. The red-throated diver is in winter plumage.

What is at stake?

Birdlife

Melrakkaslétta is on Iceland’s Nature Conservation Register, listed for its birds and its freshwater and shoreline habitats 03. Rock ptarmigan and greylag goose are classed as near threatened on the new 2025 Red List of birds 27. Ptarmigan fly a lot at dusk, when observers are not in the field. Local people have asked what level of bird mortality would be considered acceptable 06.

Wilderness and landscape

The area is uninhabited and largely undisturbed. Visibility is to be assessed up to 45 km from the outermost turbines; Norðurþing’s municipal plan states that disturbance of untouched wilderness should be avoided 06.

Darkness and northern lights

Hólaheiði is free of light pollution, and there has been talk of using it for northern lights and stargazing 06. Turbines over 100 m must be lit for aviation safety.

Wetlands and lava

The westernmost part of the area contains wetland of very high conservation value, partly on post-glacial lava. Both enjoy special protection under the Nature Conservation Act 06.

Recreation and history

The old route Hólsstígur runs along the edge of the area, a hiking and riding trail crosses it, and it is used for cross-country skiing.

Tourism

The Arctic Coast Way and the Bird Trail (Fuglastígur) pass nearby. Kópasker has guesthouses, an Earthquake Centre and a bird hide.

Soil and groundwater

What goes into the ground?

Here we review what the scoping document says about groundwater, and what research says about microplastics and epoxy shed from turbine blades.

Groundwater in lava is vulnerable

According to the scoping document, water seeps easily into the lava in the area, so the groundwater may be vulnerable to pollution. At the south-western edge of the area is an outer water protection zone, and several lakes and ponds within it are specially protected 06.

The greatest risk is during construction: about 17 km of new roads, about 250,000 m³ of fill and thousands of cubic metres of concrete. During operation, about 500 litres of oil per turbine might be needed every five years 06. The developer says concrete will not be mixed on site and materials will not be stored there.

Microplastics and epoxy from blades

Rain, hail and windblown sand gradually erode the leading edge of the blades, so particles of coating and epoxy break off and fall to the ground. A study at DTU in Denmark estimates the emission at 8–50 g per year for each onshore blade 13.

For 30 turbines with three blades each, that is about 0.7–4.5 kg per year, or about 18–110 kg over a 25-year operating life. That is small compared with other sources such as tyre wear 13. Estimates of bisphenol A (BPA) emissions suggest they are very low 15.

What is not known

No research has been carried out in Melrakkaslétta on how particles from blades – microplastics and epoxy – would affect soil and groundwater. Most existing studies were done offshore or in Denmark and the Netherlands, in conditions very different from the porous lava and wetlands of Hólaheiði, where water passes easily down to the groundwater. The rate of erosion depends on weather, and volcanic sand and hail can increase it. We believe this uncertainty belongs in the environmental impact assessment.

Note: A 2021 Norwegian report is often quoted as estimating 62 kg per turbine per year 16. A later peer-reviewed study showed that a percentage from small test samples had been wrongly applied to whole blades 14, so we do not use that figure.

The blades

Materials, disposal and speed.

Three facts about the blades that would turn above Hólaheiði.

Bisphenol-based epoxy

In 2013, about 27% of all epoxy used in Europe went into wind turbine blades 16. The most common epoxy is made from bisphenol A (BPA), a substance many countries have restricted in consumer products.

300 kilometres per hour

Based on a turbine such as the Vestas V162: maximum rotor speed 10 revolutions per minute and a 162 m rotor diameter 18. The blade tip therefore travels at about 300 km/h, many times faster than birds generally fly. See comparison ↓

Three football pitches per turbine

Each turbine sweeps about 20,600 m² 18, the size of about three football pitches. With 30 turbines that would be over 60 hectares of airspace where red-throated divers, great northern divers, greylag geese and ptarmigan fly.

Who gets away?

The speed of some Icelandic birds compared with a turbine blade tip, in km/h. None of them reaches the blade tip – not even a gyrfalcon in a dive.

Highest measured speedNormal flight
Blade tipVestas V162 at maximum rotor speed
~305 km/h
Gyrfalcondive and normal flight
~209 km/h40–56 km/h
Great northern divermigration, measured by radar
~121 km/h
Whooper swannormal flight and top speed
~100 km/h~60 km/h
Common snipedrumming display · 39–84 km/h
~84 km/h
Red-throated divermigration
~74 km/h
Golden plovermigration · measured on grey plover
~59 km/h
White-tailed eaglemigration
~52 km/h

The figures come from different measurements (migration, hunting, diving) and are indicative, not a precise comparison. For golden plover, a measurement of grey plover, a closely related species, is used. In theory a gyrfalcon could reach up to 250 km/h in a very long dive 23.

Where do 90 blades go after 25 years?

Hnotasteinn would have 30 turbines and 90 blades, each about 80 m long. Laid end to end they would stretch about 7.2 km – further than from the project site to Kópasker.

7.2 kmof blades

For comparison

The blades, laid end to end
7.2 km
Vaðlaheiði tunnel (in rock) 24
7.2 km
Longer section of the Héðinsfjörður tunnels 25
6.9 km
From the project site to Kópasker 06
6.5 km
Hvalfjörður tunnel 25
5.8 km
Laugavegur street in Reykjavík 26
about 2 km

Each blade is about 80 m long – longer than Hallgrímskirkja church is tall (74.5 m). The 90 blades would stretch as far as the Vaðlaheiði tunnel and be more than three times the length of the whole of Laugavegur.

Blades made of glass fibre and epoxy are hard to recycle, and thousands of tonnes have ended up in landfill. The European wind industry association itself admits that recycling solutions are neither sufficiently developed nor cost-competitive. The industry adopted a voluntary landfill ban from 1 January 2026, but it is a sector commitment, not law 17. Who will pay when the blades are taken down?

06 / Local voices

What local people say.

From comments submitted on the scoping document in autumn 2020 06.

Halldóra Gunnarsdóttir, Kópasker

“I really love this untouched land on Hólaheiði, completely free of light pollution, which shows you the moon, the stars and the northern lights.” She asks whether the turbines will be seen or heard from the churchyard, the folk museum and hiking trails.

Norðurhjari, tourism association

Objected to the area being described as remote with little tourism. Pointed to accommodation, the Earthquake Centre, the Snartarstaðir Folk Museum, the artwork Dansinn, Hallveigarlundur, the Bird Trail and the Arctic Coast Way.

Norðurslóð Touring Club

Untouched wilderness is sought after by hikers and outdoor enthusiasts. A large area of this kind would be spoiled, a good cross-country skiing area destroyed, and the ancient route Hólsstígur must not be disturbed.

Jón Grímsson, Kópasker

The wide open views on Hólaheiði make the area unique for enjoying the northern lights and stargazing, and there has been talk of using it for winter tourism.

Aðalsteinn Örn Snæþórsson, Víkingavatn

The ptarmigan population is at a historic low and the birds should be given the benefit of the doubt: two years of research are needed unless it is shown that no sensitive species pass through the area.

Gunnar Einarsson, Daðastaðir

It must be defined what level of bird mortality is acceptable and how to respond if it turns out higher than expected – and whether the developer would then be prepared to stop operating.

07 / Status

A big decision.
A process that matters.

Here are confirmed milestones from available sources. A proposal, a review and a permit are different steps.

Sources reviewed in September 2026.

Read the original sources ↓
  1. Scoping document submitted

    Qair presented a proposed scoping document for 34 turbines and 200 MW. 13 parties submitted comments. The National Planning Agency approved the proposal with comments in 2021 06 07.

  2. Residents’ protests delayed a planning change

    Norðurþing’s municipal executive postponed a change to the municipal plan after protests from residents around Öxarfjörður 09. At the end of August the council unanimously agreed to postpone planning changes until the environmental impact assessment was complete 11.

  3. Proposal: on hold

    The 5th-phase Master Plan project board submitted a proposal classifying ten wind power options. Hnotasteinn was proposed for the on-hold category, partly because of uncertainty about impacts on birdlife, social impacts and grid connection costs 05.

  4. Previous majority requested re-assessment

    The then majority of Norðurþing municipal council asked for Hnotasteinn to be re-assessed and moved from the on-hold category to the energy-use category 08.

  5. New municipal council

    After the municipal elections on 16 May, the Independence Party, the Social Democratic Alliance, the Progressive Party and Óskalisti formed a new majority in Norðurþing 28.

  6. New wind power law

    Iceland’s parliament adopted stricter rules for wind power. The position of municipalities becomes a fundamental factor in the Master Plan’s assessment of wind power options, with particular attention to impacts on birdlife and wilderness 29.

  7. No formal position

    The council stated that it had not taken a formal position on the development. Emphasis was placed on consultation and a comprehensive assessment of impacts 04.

  8. Re-assessment: on hold again

    Hnotasteinn was re-assessed in the 6th phase of the Master Plan. The project board again proposes the on-hold category – not energy use. The impact on unspoiled wilderness is rated the greatest of seven wind power options and considered likely to limit opportunities for tourism and outdoor recreation. Comments can be submitted in the consultation portal until 4 January 2027 33. See the new assessment ↑

  9. Now is the time

    Under the new law, Norðurþing’s position carries great weight. As long as the council has not taken a position, the voice of residents and the public can make a difference. Sign the petition ↓ Comment on the Master Plan ↗

For comparison · Vaðalda wind farm
14 + 14

Landsvirkjun started Iceland’s first wind farm, Vaðölduver, on 15 September 2026 with 14 turbines; 14 more will be built in 2027 10. Those turbines are about 150 m tall at the highest blade position 12 – at Hnotasteinn, up to 200 m is assumed.

08 / Our position

We want to protect the future of Melrakkaslétta.

We believe Melrakkaslétta should not become an industrial zone for a large wind farm.

Our position is based on the importance of nature, birdlife and landscape. We believe the location of renewable energy production matters and that the natural values of Melrakkaslétta should weigh heavily in the decision.

Skrifa rafrænt undir á Ísland.is með rafrænum skilríkjum ↗
09 / Questions and answers

Good questions deserve clear answers.

Are you against all wind power?

No. Our position is about location. We believe the natural values of Melrakkaslétta should weigh heavily when deciding where wind farms are built.

Will the turbines definitely be 200 metres tall?

That is not final, as the turbine model has not been chosen. The scoping document assumed a blade tip reaching about 200 m above ground, and Qair cites the same maximum height 02 06.

Do the bird figures show the impact of the project?

No. The figures for red-throated diver, great northern diver and gyrfalcon are 2016 data for the whole of Melrakkaslétta. They show which species the area supports, but are neither a count at Hnotasteinn nor a forecast of bird deaths 03.

Has Norðurþing approved the development?

No. In January 2026 the previous majority asked for Hnotasteinn to be moved to the energy-use category, but according to minutes of 17 September 2026 the new council has not taken a formal position 04 08.

What does the new wind power law change?

The law adopted by parliament on 19 June 2026 rules out wind farms in protected areas, Ramsar sites and areas on Part B of the Nature Conservation Register. Hólaheiði does not fall into those categories, so Hnotasteinn is not automatically excluded. However, the law makes the municipality’s position a fundamental factor in the Master Plan assessment – which is why Norðurþing’s position, and your signature, matter 29 31.

What does the Master Plan’s on-hold category mean?

Under Act No. 48/2011, the on-hold category is for options considered to need more information before it can be decided whether they go into the energy-use or protection category. Hnotasteinn is therefore neither approved nor rejected. In the project board’s report (October 2026), Hnotasteinn receives the highest score of seven wind options for impact on unspoiled wilderness (16.8 of 20), and expert group 1 rates it the option with the greatest impact on natural and cultural heritage. The proposal is open for consultation until 4 January 2027 and anyone can submit a comment 33.

Is all of Melrakkaslétta protected?

No. The area is not protected. Melrakkaslétta is on the Nature Conservation Register as “other natural heritage” and designated an internationally Important Bird Area. It is not among the seven areas parliament placed on Part B of the register in November 2025 30. Wetlands and post-glacial lava in the area enjoy special protection under the Nature Conservation Act 03 06.

Is this a valid electronic signature?

Signing takes place on the official petition service of Ísland.is, and you identify yourself with Icelandic electronic ID. This ensures that every signature belongs to a real person. Signing therefore requires an Icelandic ID number (kennitala) and electronic ID.

10 / Make your voice heard

The future of the land concerns us all.

“The land is fair and free”– Jónas Hallgrímsson, Ísland (1835)

  1. 1Read the petition.
  2. 2Identify yourself with Icelandic electronic ID on Ísland.is.
  3. 3Confirm your signature – and share this page.

The petition closes 16 December 2026

We oppose a wind farm at Hnotasteinn

We, the undersigned, oppose plans to build a wind farm on Hólaheiði at Hnotasteinn. The proposed development would have a major visual impact on a large area that is otherwise largely untouched and characterised by few visible structures. The project could also affect the area’s rich birdlife. Untouched wilderness is precious and rare in Europe. Such a development would have a permanent and irreversible impact on the landscape, the experience of nature and the image of the area. It could affect residents’ quality of life, outdoor recreation and tourism in the area. We call on Norðurþing municipal council to abandon plans for an industrial zone on Hólaheiði.

The petition runs 16.09.2026 – 16.12.2026 · Responsible person: Halldóra Gunnarsdóttir

Skrifa rafrænt undir á Ísland.is með rafrænum skilríkjum ↗

You will be taken to Ísland.is, where the petition is in Icelandic. Signing requires Icelandic electronic ID. No ID? You can still help by sharing this page. This site collects no personal data.

11 / Data and sources

You should be able to verify.

Developer plans, research data and official minutes are each labelled separately.

  1. 01
    Developer · Qair Ísland · qair.isHnotasteinn – project overviewNumber of turbines, installed capacity and the developer’s view of the benefits.
    Open ↗
  2. 02
    Developer · Qair Ísland · qair.isQuestions and answers about the projectHeight, choice of turbines and a rough estimate of foundation materials.
    Open ↗
  3. 03
    Icelandic Institute of Natural HistoryMelrakkaslétta – Important Bird Area and Nature Conservation RegisterBoundaries, natural features, conservation value and bird data.
    Bird area ↗Conservation Register ↗
  4. 04
    Norðurþing · 17.09.2026166th meeting of the municipal councilFormal status of the council’s position and its emphasis on impacts and consultation.
    Open ↗
  5. 05
    Master Plan · 2025Expert group 4 report on wind power optionsAssessment of wind power options, including Hnotasteinn’s grid connection costs. Summary of the project board’s on-hold proposal: Bændablaðið, 23.01.2026.
    Final report (PDF) ↗Report (PDF) ↗Bændablaðið ↗
  6. 06
    EFLA for Qair · 25.02.2021Hnotasteinn wind farm – proposed scoping documentProject description, environmental factors and comments received.
    Open ↗
  7. 07
    National Planning Agency · 2021Decision on the scoping documentScoping proposal approved with comments.
    Open ↗
  8. 08
    Viðskiptablaðið · 01.02.2026“The premises have changed”Council majority requests re-assessment of Hnotasteinn.
    Open ↗
  9. 09
    Vísir · 22.07.2021Municipal executive postpones planning change after residents’ protestsOlder news item describing the situation on its date of publication.
    Open ↗
  10. 10
    Landsvirkjun · 15.09.2026Iceland’s first wind farm in operationVaðölduver started with 14 turbines; 14 more in 2027.
    Open ↗
  11. 11
    Vikublaðið · 02.09.2021Council postpones planning changes until environmental assessment is completeProposal to postpone adopted unanimously by Norðurþing municipal council.
    Open ↗
  12. 12
    Sunnlenska · 15.09.2026Iceland’s first wind farm in operationHeight of the turbines at Vaðölduver.
    Open ↗
  13. 13
    DTU · Energies · 2024 · peer-reviewedMicroplastics Emission from Eroding Wind Turbine Blades: Preliminary Estimations of VolumeMishnaevsky et al. Estimate of plastic emissions from onshore and offshore blades.
    Open ↗
  14. 14
    Wind Energy Science · 2025 · peer-reviewedEstimating microplastic emissions from offshore wind turbine blades in the Dutch North SeaCaboni et al. Comparison of earlier estimation methods, including the 2021 Norwegian report.
    Open ↗
  15. 15
    NedZero · Dutch wind energy industry associationBPA emissions from wind turbinesSummary of estimates of BPA and microplastic emissions from blades. Published by an interest group.
    Open ↗
  16. 16
    Solberg et al. · Norway · 2021 · not peer-reviewedForurensing fra vindturbinvinger / Leading Edge erosion and pollution from wind turbine blades“The Turbine Group”. A report on Norwegian conditions that estimated much higher emissions than later peer-reviewed studies.
    Norwegian version ↗English version ↗
  17. 17
    WindEurope · European wind industry associationWind industry calls for Europe-wide ban on landfilling turbine bladesStatus of blade recycling and the industry’s voluntary landfill ban.
    Open ↗
  18. 18
    Technical data · wind-turbine-models.comVestas V162 – rotor speed and swept areaMaximum 10 rpm, 162 m rotor diameter, 20,612 m² swept area.
    Open ↗
  19. 19
    J. R. Soc. Interface · 2013 · peer-reviewedAir speeds of migrating birds observed by ornithodolitePennycuick et al. Measured airspeeds including red-throated diver (20.6 m/s), white-tailed eagle (14.4 m/s) and grey plover (16.5 m/s).
    Open ↗
  20. 20
    Birds of the World · Cornell LabCommon Loon – Movements and MigrationGreat northern diver on migration, about 121 km/h, measured by radar (Kerlinger 1982).
    Open ↗
  21. 21
    Wikipedia · summaryList of birds by flight speedFlight speeds of whooper swan and gyrfalcon, citing primary sources.
    Open ↗
  22. 22
    Wikipedia · summaryDrumming (snipe)Speed of common snipe in drumming display, about 39–84 km/h.
    Open ↗
  23. 23
    Birds of the World · Cornell LabGyrfalcon – BehaviorGyrfalcon diving flight (Tucker et al. 1998).
    Open ↗
  24. 24
    Vaðlaheiðargöng hf.About the tunnelThe tunnel is about 7.2 km in rock, about 7.5 km in total including portals.
    Open ↗
  25. 25
    Vísindavefurinn (University of Iceland Science Web)Which are Iceland’s longest tunnels?Lengths of road tunnels in Iceland, including the Héðinsfjörður and Hvalfjörður tunnels.
    Open ↗
  26. 26
    I Am ReykjavíkLaugavegurLaugavegur is about 2 km long, from Kringlumýrarbraut to Bankastræti.
    Open ↗
  27. 27
    Icelandic Institute of Natural History · 20252025 Red List assessment of birdsRock ptarmigan and greylag goose are among 19 near-threatened species.
    Open ↗
  28. 28
    Vísir · 2026Municipal elections 2026New majority formed on Norðurþing municipal council.
    Open ↗
  29. 29
    Government of Iceland · 19.06.2026Stricter rules on wind power adopted by parliamentExclusion of protected areas and Part B of the Nature Conservation Register; municipal position a fundamental factor.
    Open ↗
  30. 30
    Government of Iceland · 14.11.2025Parliamentary resolution on the Nature Conservation Register action plan adoptedSeven areas on Part B for 2025–2029. Melrakkaslétta is not among them.
    Open ↗
  31. 31
    Bændablaðið · 24.09.2026Questions about protection and windNews analysis of the new law; Hnotasteinn mentioned among projects in progress.
    Open ↗
  32. 32
    Kúlumyndir · 03.10.2026360° images of Melrakkaslétta with wind turbinesPhoto taken 3 October 2026; 30 turbines inserted at 14 km and 3 km distance.
    Open ↗
  33. 33
    Project board, 6th phase of the Master Plan · 13.10.2026Proposed classification of seven wind power projects – Hnotasteinn on holdOpen consultation 12 October 2026 – 4 January 2027 (case 4349). Wilderness 16.8 of 20, the highest of seven options.
    Report (PDF) ↗Consultation portal ↗
  34. 34
    Vísir · 12.05.2026Blowing away the nonsense of the V-list and the Centre PartyFriðjón Þórðarson, CEO of Qair Ísland: up to 30 turbines, 200 m, 7.2 MW each.
    Open ↗
  35. 35
    Vísir · 06.05.2026Wind power in Melrakkaslétta – a test of our prioritiesOpinion piece, Árdís H. Jónsdóttir, Öxarfjörður.
    Open ↗
  36. 36
    Vísir · 19.06.2026Aggressive lobbyists of the wind industryOpinion piece, Anna Soffia Kristjánsdóttir.
    Open ↗

Last updated 19 October 2026. Older data may refer to a different design. We link each key claim to the source it is based on. Most sources are in Icelandic.

Map of Melrakkaslétta showing the Hnotasteinn study area within an Important Bird Area

The Hnotasteinn study area (yellow-green). Map based on a map by EFLA. Click the map to enlarge further.

We oppose a wind farm at Hnotasteinn

A wind farm on Hólaheiði at Hnotasteinn would have a major visual impact on a large, largely untouched area and could affect its rich birdlife. We call on Norðurþing municipal council to abandon plans for an industrial zone on Hólaheiði.

Read the full text of the petition
We, the undersigned, oppose plans to build a wind farm on Hólaheiði at Hnotasteinn. The proposed development would have a major visual impact on a large area that is otherwise largely untouched and characterised by few visible structures. The project could also affect the area’s rich birdlife. Untouched wilderness is precious and rare in Europe. Such a development would have a permanent and irreversible impact on the landscape, the experience of nature and the image of the area. It could affect residents’ quality of life, outdoor recreation and tourism in the area. We call on Norðurþing municipal council to abandon plans for an industrial zone on Hólaheiði.

The petition runs 16.09.2026 – 16.12.2026 · Responsible person: Halldóra Gunnarsdóttir

Skrifa rafrænt undir á Ísland.is með rafrænum skilríkjum ↗

You will be taken to Ísland.is, where the petition is in Icelandic. Signing requires Icelandic electronic ID. No ID? You can still help by sharing this page. This site collects no personal data.

Skrifa rafrænt undir á Ísland.is með rafrænum skilríkjum ↗